January 25th 2018 | Niles-Buchanan Road patch | Spec | Tab |
January 31st 2018
| Aggregates | Spec | Tab |
January 31st 2018
| Wheel Loader | Spec | Tab |
January 31st 2018
| Maiden Lane Proposal | Spec | Tab |
January 31st 2018
| Baldwin Road Proposal | Spec | Tab |
January 31st 2018
| HMA overlay, Union Pier Road | Spec | Tab |
February 7th 2018 | HMA Ultra-thin, 4.07 miles, Lincoln Township | Spec | Tab |
February 7th 2018
| HMA Overlay, 0.33 miles, 15th Street, Niles | Spec | Tab |
February 14th 2018
| HMA overlay, Eau Claire Road | Spec | Tab |
February 14th 2018
| HMA overlay, Fulkerson Road | Spec | Tab |
February 14th 2018
| HMA overlay, Crystal Avenue | Spec | Tab |
February 14th 2018
| 20 Ton Tilt-Deckover Trailer | Spec | Tab |
February 21st 2018
| HMA overlay, Arnt Boulevard, Watervliet Township | Spec | Tab
|
February 21st 2018
| HMA overlay, Lane Drive, Watervliet Township | Spec | Tab
|
February 21st 2018
| HMA overlay, Marq Woods Road, Lincoln Township | Spec | Tab
|
February 21st 2018
| Tree Trimming/Removal, Territorial Road | Spec | Tab
|
February 28th 2018
| Prefabricated Signs | Spec | Tab
|
February 28th 2018
| U-channel posts, sign brackets | Spec | Tab
|
February 28th 2018
| Reflect. Sign Faces, roll material, etc. | Spec | Tab
|
February 28th 2018
| Aluminum Sign Blanks | Spec | Tab
|
February 28th 2018
| Waterborne Pavement Marking Paint | Spec | Tab
|
February 28th 2018
| Glass Beads for Pavement Marking Paint | Spec | Tab
|
February 28th 2018
| Pavement Marking Application | Spec | Tab
|
February 28th 2018
| Specialty Pavement Marking Application | Spec | Tab
|
March 7th 2018
| Bridge Inspection | Spec | Tab
|
March 7th 2018
| Ultra thin asphalt - Coloma Twp | Spec | Tab
|
March 7th 2018
| HMA overlay, Cedar Lane - Sodus Twp | Spec | Tab
|
March 7th 2018
| HMA overlay, various roads - Coloma Twp | Spec | Tab
|
March 7th 2018
| HMA overlay, Watson Road - Sodus Twp | Spec | Tab
|
March 7th 2018
| Elm Valley Rd - Emergency Culvert Repair | N/A
| Tab
|
April 5th, 2018
| Aggregate Base Course - 19.62 miles
| Spec
| Tab
|
April 5th, 2018
| HMA Base Crushing Modified - 13.82 miles
| Spec
| Tab
|
April 5th, 2018
| Gordon's Curve HMA Overlay
| Spec
| Tab
|
April 19th, 2018
| Brandywine Shores HMA Overlay
| Spec
| Tab
|
April 19th, 2018
| Polymer Modified Asphalt Sealing (Trap rock) & Fog Seal
| Spec
| Tab
|
April 19th, 2018
| Maintenance Bituminous Mixtures
| Spec
| Tab
|
April 19th, 2018
| Hot Melt Crack Filler Material
| Spec
| Tab
|
April 19th, 2018
| Corrugated Metal Pipe & Metal End Section
| Spec
| Tab
|
April 19th, 2018
| Liquid Calcium Chloride
| Spec
| Tab
|
April 19th, 2018
| Underwater Bridge Inspections Services
| Spec
| Tab
|
April 26th, 2018
| 2018 County Wide Mowing
| Spec
| Tab
|
April 26th, 2018
| 2018 Spring Weed/Brush Guardrail & Road Crack Spraying
| Spec
| Tab
|
April 26th, 2018
| Scraper Blades
| Spec
| Tab
|
April 26th, 2018
| Ice Control Sand
| Spec
| Tab
|
April 26th, 2018
| Bridge Design Services (Glendora Road Bridge)
| Spec
| Tab
|
April 26th, 2018
| Hollywood Heights HMA Overlay
| Spec
| Tab
|
April 26th, 2018
| 2018 Steel Beam Guardrail & Hardware
| Spec
| Tab
|
May 3rd, 2018
| Louise Lane HMA Overlay
| Spec
| Tab
|
May 17th, 2018
| Napier Avenue HMA Overlay
| Spec
| Tab
|
May 24th, 2018
| Non-Motorized Path Asphalt Seal
| Spec
| Tab
|
May 24th, 2018
| Watervliet Township Slurry Seal
| Spec
| Tab
|
May 24th, 2018
| Higman Park Hill 1 & 2 HMA Overlay
| Spec
| Tab
|
May 24th, 2018
| Bituminous Seal
| Spec
| Tab
|
June 27th, 2018
| Red Arrow Hwy, resurfacing (Coloma to Watervliet)
| Spec
| Tab
|
June 27th, 2018
| Harbert Road Widening & Overlay
| Spec
| Tab
|
June 27th, 2018
| Cleveland Avenue Joint Repair
| Spec
| Tab
|
June 27th, 2018
| Blue Star Highway Hma Overlay
| Spec
| Tab
|
August 7th, 2018
| Red Arrow Drainage Project
| Spec
| Tab
|
June 18, 2018
| County wide tree trimming & removal
| Spec
| Tab
|
August 7th, 2018
| Hipps Hollow Road HMA Overlay
| Spec
| Tab
|
September 5th, 2018
| Red Bud Trail HMA Overlay
| Spec
| Tab
|
September 5th, 2018
| Red Bud Trail retaining wall
| Spec
| Tab
|
September 5th, 2018
| Aggregate Base Course - 8.55 miles
| Spec
| Tab
|
September 5th, 2018
| HMA Base Crushing - 8.55 miles
| Spec
| Tab
|
September 5th, 2018
| Aggregate Base Course - 10.85 miles
| Spec
| Tab
|
September 26, 2018
| Bundy Road HMA
| Spec
| Tab
|
September 26, 2018
| Roslin Road HMA Overlay
| Spec
| Tab
|
October 25, 2018
| Cleveland Ave Drainage Structure Adjustments
| Spec
| Tab
|
November 21, 2018
| Flynn Rd & Youngren Rd Guardrail
| Spec
| Tab
|
December 5, 2018
| Jones Road Drainage
| Spec
| Tab
|